1. 7/5/14, Insulated concrete form basement underway (looks a lot like a giant beer cooler):
2. 7/16/14, Basement getting poured
3. 7/16/14, Yeah cement trucks!
4. 7/16/14, The boy is loving the equipment
5. 7/16/14, The girlies
6. 7/16/14, More of the basement pour
7. 7/16/14, Basement floor creation observation
8. 7/19/14, Dry basement floor ready to rumble
9. 7/20/14, FLOOR TRUSSES!!!
10. 7/20/14, Floor trusses in place
11. 7/21/14, A new dance floor
12. 7/21/14, Upper view of the finished first floor sub floor
13. 7/23/14, THE LOGS ARRIVE!!!
14. 7/28/14, Logs going up!
15. 7/29/14, Logs keep climbing
16. 8/5/14, Logs reach the second floor
17. 8/7/14, Second floor system goes in
18. 8/7/14, Beams glorious beams (these will be the exposed beams)
19. 8/7/14, Room with a view
20. 8/7/14, Celebrating the progress on the second floor
21. 8/7/14, Detail of the lovely logs